110 Entrada Development 110 Entrada Development - Purchase, Sale and Development Agreement under consideration
20th Street Mixed-Use Development The County Community Development Department, Economic Development Division, seeks a qualified and innovative respondent to purchase and improve certain county-owned parcels collectively known as the 20th Street redevelopment.
37th Street and Pinon Park ADA Update and Renovations CSD is updating playgrounds and equipment to meet ADA Accessibility requirements, as noted in the ADA Audit and Transition Plan and the CSD Integrated Master Plan.
Abiquiu New Office Addition An insurance inspection of the Abiquiu hydroelectric plant found that the existing office location with respect to the plant transformer creates a hazard to personnel. The transformer is directly opposite the exterior wall of the office. The hazard is the risk of explosion if the transformer fails.
Abiquiu Unit #3 Draft Tube Design The existing draft tube on unit #3 in Abiquiu is wearing from cavitation created by the dissolved oxygen injection system.
ADA Audit and Transition Plan Implementation of the ADA Audit Transition Plan that was finalized in 2022. The ADA Audit and Transition Plan is a federal requirement to identify gaps in outdoor recreation amenities and remove barriers that prevent use by those with disabilities. The implementation is prioritized by short-, mid-, and long-term transitions to bring out of compliance items into compliance.
Ashley Pond Park Electrical Upgrade Project Los Alamos County Capital Projects and Facilities Division will begin the Ashley Pond Park Electrical Upgrade Project to improve the existing electrical panels used to supply power for food trucks and other vendors during events held at the park (2300 Trinity Drive, Los Alamos).
Bathtub Row Reconstruction Project The project consists of a full reconstruction of Bathtub Row between Central Avenue and Peach Street, Nectar Street from Peach Street to 15th Street, and a portion utility work on 15th St. to Iris Street.
Bayo Booster Station Tank (Phase II) Construct a new 833,000 gallon non-potable water tank at the Bayo Booster Station, expand storage from 182,000 gallons to 1,015,000 gallons.(Phase 2 of this project).